Design-Build Continued
Before
 E.F.Deering Co. was contracted to design and install Railings and Decking
by 21st Century Building Co.(http://www.21stcenturybuildingcompany.com/) which was contracted by the owners to strip all trim and siding and install Hardi Plank® siding.
After
Lock Dry® Decking  and Railing Works® Rails
White lake
http://www.fsihp.com/
Before
Because the entire deck structure,Decking and railing were Cedar it had to be rebuilt to eliminate rotted wood.
After
We built a new stairs for a more comfortable Rise and Run.  Some of the existing posts were ok but others were changed or added to insure structural integrity. All were covered with MiraTec® treated composite wood and CertainTeed ® pvc trim boards
 
Lock Dry® Decking stairs and Railing Works® Cable Rails
http://www.fsihp.com/
Combination of Cable and Glass rails. Railing to Post W/ 3" posts